Ministry of New and Renewable Energy (MNRE) has launched the Pradhan Mantri Kisan Urja Suraksha evem Utthan Mahabhiyan (PM KUSUM) Scheme for farmers for installation of solar pumps and grid-connected solar and other renewable power plants in the country. The scheme aims to add solar and another renewable capacity of 25,750 MW by 2022 with the total central financial support of Rs. 34,422 Crore including service charges to the implementing agencies.

Pradhan Mantri Kisan Urja Suraksha evem Utthan Mahabhiyan (PM KUSUM) Scheme

Scheme Components
The Scheme consists of three components:
  1. Component A: 10,000 MW of Decentralized Ground Mounted Grid Connected Renewable Power Plants of individual plant size up to 2 MW.
  2. Component B: Installation of 17.50 lakh standalone Solar Powered Agriculture Pumps of individual pump capacity up to 7.5 HP.
  3. Component C: Solarisation of 10 Lakh Grid-connected Agriculture Pumps of individual pump capacity up to 7.5 HP.

Scheme implementation

State Nodal Agencies(SNAs) of MNRE will coordinate with States/UTs, Discoms and farmers for implementation of the scheme.

Components A and C of the Scheme will be implemented in Pilot mode till 31st December 2019. Component B, which is an ongoing sub-programme, will be implemented in entirety without going through pilot mode.

The capacities to be implemented under pilot mode for the Components A and C are as follows:
  1. Component A: Commissioning of 1000 MW capacity of ground/ stilt mounted solar or other renewable energy source based power projects
  2. Component C: Solarization of 1,00,000 grid-connected agriculture pumps
  3. On successful implementation of a pilot run of Components A and C of the Scheme, these components would be scaled-up, after getting necessary approval.

Scheme benefits

The scheme will open a stable and continuous source of income to the rural landowners for a period of 25 years by utilisation of their dry/uncultivable land. Further, in case cultivated fields are chosen for setting up solar power project, the farmers could continue to grow crops as the solar panels are to be set up above a minimum height.

The proposed scheme would ensure that sufficient local solar/ other renewable energy-based power is available for feeding rural load centres and agriculture pump-set loads, which require power mostly during the day time. As these power plants will be located closer to the agriculture loads or to electrical substations in a decentralized manner, it will result in reduced Transmission losses for STUs and Discoms. Moreover, the scheme will also help the Discoms to achieve the RPO target

The solar pumps will save the expenditure incurred on diesel for running diesel pump and provide the farmers with a reliable source of irrigation through the solar pump apart from preventing harmful pollution from running diesel pump. In light of the long waiting list for electric grid connection, this scheme will benefit 17.5 lakh farmers over a period of four years, without adding to the grid load.
  • PM KUSUM Scheme Video Detail In Gujarati: Click Here
  • To access the complete operational guidelines of the scheme, click here

No comments:

Post a Comment

Please Comment Your Questions, Queries or Suggestions