KUSUM Solar Pump Scheme 2025, offering full clarity on benefits, eligibility, subsidies, and how to apply—backed by current official sources.
🌞 What Is the KUSUM Scheme?
Launched in March 2019 by MNRE, Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan (PM-KUSUM) empowers farmers in India by promoting solar-powered irrigation. It encourages:
-
Affordable irrigation through solar pumps,
-
Income generation via selling surplus solar energy to DISCOMs,
-
And a move away from fossil-fuel dependency
📌 Three Key Components
Component A – Grid-connected solar power plants (500 kW–2 MW)
-
Ideal for farmers, FPOs, co-ops to install plants on barren/uncultivated land.
-
No direct capital subsidy—earn through Power Purchase Agreements (PPAs) (typically ₹3–3.5/unit for 25 years).
-
DISCOMs get performance incentives: ₹0.40/unit (up to ₹6.6 lakh/MW for 5 years)
Component B – Standalone off-grid solar pumps (up to 7.5 HP)
-
Designed for areas without reliable electricity.
-
Subsidy: 30% central + ≥30% state. In special zones (NES, J&K, hilly regions, islands) central subsidy is 50%, reducing farmer contribution to 20%
-
Farmers may avail loan covering ~30%, paying just 10% upfront
Component C – Solarization of existing grid-connected pumps
-
The PV module can be up to twice the pump’s kW rating.
-
Same subsidy pattern as Component B.
-
Excess power can be sold to DISCOMs via net-metering
💡 Subsidy & Financing Breakdown
Component / Region | Central Subsidy | State Subsidy | Farmer Pays | Loan Option |
---|---|---|---|---|
Component B & C – Normal | 30% | ≥30% | ~10% ↑ | Up to 30% bank loan |
Special Regions (NES, etc.) | 50% | ≥30% | ~20% | Up to 30% loan |
➡️ Farmer’s upfront small: 10–20%, banks cover loanable 30%; rest by govt
✅ Who Is Eligible?
-
Individual farmers, tenant farmers (tenant with 10-year lease), FPOs, coopers, panchayats, water-user associations, etc.
-
For Component A: Plant site must be within 5 km of a substation
📄 Documents Required
-
Aadhaar (linked),
-
Land records (7/12 extract, Khatauni),
-
Bank details,
-
Caste certificate (for SC/ST),
-
Passport photo and any affidavits/leases (e.g., tenant farmers)
🛠️ Application Process (Online & Offline)
-
Register on the PM-KUSUM portal https://mnre.gov.in/kusum.
-
Login & apply, choose component, submit land/pump/bank info.
-
Upload docs, complete Aadhaar and land verification.
-
Pay farmer's share (~10%) upon approval to vendor.
-
Vendor installs pumps within ~24 months.
-
Subsidy released after installation and verification
⌛ Typically, subsidy clearance takes 90–120 days, and installation completes in 4–8 weeks post-sanction
🌟 Top Benefits for Farmers
-
Massive savings on electricity/diesel.
-
Reliable irrigation regardless of power cuts.
-
Income from power sales (Component A & C).
-
Environment-friendly farming, reducing carbon footprint.
-
High subsidies, low-interest loans, and in some cases, free maintenance for 3–5 years
-
In special states, subsidy covers up to 80–90%, even down to 5% farmer share for SC/ST .
⚠️ Cautions & Tips
-
Beware of fraudulent agents claiming quick installation for extra fees. Registration and payments must be done only via official portal and designated vendors .
-
Decide component based on electricity availability and land type.
-
SC/ST farmers in some states get further discounts—check your state’s policies.
📝 Quick State-Wise Snapshot (Example)
-
Rajasthan: ~90% subsidy, SC/ST extra support.
-
Maharashtra: ~85% subsidy + free 5-year maintenance.
-
Uttar Pradesh: ~80% subsidy + subsidized loans.
-
Punjab: ~75% subsidy + maintenance benefits.
Verify precise details with your state’s agriculture/DISCOM portal.
🚀 Next Steps
-
Visit the official PM-KUSUM portal (pmkusum.mnre.gov.in) and select your state.
-
Confirm the eligible component, subsidy %, and vendor list.
-
Apply online, or approach your local agriculture or DISCOM office for offline application.
✅ In Summary
2025’s PM-KUSUM scheme stands out for:
-
Generous subsidy levels (up to 90% in select regions),
-
Low farmer contributions (5–20%),
-
Income streams via selling surplus power,
-
And supportive loan options.
No comments:
Post a Comment
Please Comment Your Questions, Queries or Suggestions